Agile Hive | SAFe Structure ART PI Planning Roadmaps

Agile Hive | SAFe Structure ART PI Planning Roadmaps

Vendor: Seibert | Key: net.seibertmedia.jira.plugins.agilehive

jira server datacenter

Agile Hive is a SAFe® solution to help you adopt and scale agile across your enterprise. Connect Portfolio, Products, and Teams. Supports all SAFe® configurations "Full SAFe®", "Large Solution SAFe®", "Portfolio SAFe®" & "Essential SAFe®".

View on Marketplace
Versions (87) - Last 1 Year, Server/Data Center Only
Version Build Release Date Compatibility Hosting Status Actions Description
4.7.0-jira11 800200253680 2025-12-01 Jira Data Center 11.0.0 - 11.2.1 datacenter Pending
Release Notes:

Features

  • Dates are now formatted according to the user's browser locale.
  • The burn-up chart can display the time between iterations.

Improvements

  • Creating and editing a PI is prevented if a team uses a board filter containing multiple projects.

Bug Fixes

  • Warning triangles are no longer shown for resolved dependencies in another PI.
  • Fixed a NullPointerException in Team Breakouts caused by incorrectly referenced issues.
  • Fixed multiple reloads of issues and milestones on the roadmap when using “Update data.”
  • Fixed a bug where sprints covering a calendar year change would display the wrong year.

For further informations about this release, please refer to our release notes page:
Version 4.7.0

4.7.0-jira10 800200253660 2025-12-01 Jira Data Center 10.0.0 - 10.7.4 datacenter Pending
Release Notes:

Features

  • Dates are now formatted according to the user's browser locale.
  • The burn-up chart can display the time between iterations.

Improvements

  • Creating and editing a PI is prevented if a team uses a board filter containing multiple projects.

Bug Fixes

  • Warning triangles are no longer shown for resolved dependencies in another PI.
  • Fixed a NullPointerException in Team Breakouts caused by incorrectly referenced issues.
  • Fixed multiple reloads of issues and milestones on the roadmap when using “Update data.”
  • Fixed a bug where sprints covering a calendar year change would display the wrong year.

For further informations about this release, please refer to our release notes page:
Version 4.7.0

4.7.0-jira9 800200253640 2025-12-01 Jira Data Center 9.4.0 - 9.17.5 datacenter Pending
Release Notes:

Features

  • Dates are now formatted according to the user's browser locale.
  • The burn-up chart can display the time between iterations.

Improvements

  • Creating and editing a PI is prevented if a team uses a board filter containing multiple projects.

Bug Fixes

  • Warning triangles are no longer shown for resolved dependencies in another PI.
  • Fixed a NullPointerException in Team Breakouts caused by incorrectly referenced issues.
  • Fixed multiple reloads of issues and milestones on the roadmap when using “Update data.”
  • Fixed a bug where sprints covering a calendar year change would display the wrong year.

For further informations about this release, please refer to our release notes page:
Version 4.7.0

4.6.0-jira11 800200253550 2025-10-27 Jira Data Center 11.0.0 - 11.1.1 datacenter Pending
Release Notes:

Jira 11 Support

This release adds support for Jira 11

Cloud Migration

  • Planned dates for issues displayed on the Roadmap are now included when migrating to Agile Hive on Jira Cloud.

Bugfixes

  • Team Breakout Board: Resolved several issues related to the art-issues API call and improved the performance of the Unplanned Issues sidebar retrieval logic.
  • Team Report: Enhanced JQL filters executed when clicking the issue count per sprint. Fixed filtering in the Kanban view to ensure JQL queries correctly respect the selected PI and swimlanes.
  • Roadmaps: Fixed a timezone-related issue that caused overlapping issues when users in different timezones edited the roadmap or planned start/end dates.

For further informations about this release, please refer to our release notes page:
Version 4.6.0

4.6.0-jira10 800200253510 2025-10-15 Jira Data Center 10.0.0 - 10.7.4 datacenter Pending
Release Notes:

Cloud Migration

  • Planned dates for issues displayed on the Roadmap are now included when migrating to Agile Hive on Jira Cloud.

Bugfixes

  • Team Breakout Board: Resolved several issues related to the art-issues API call and improved the performance of the Unplanned Issues sidebar retrieval logic.
  • Team Report: Enhanced JQL filters executed when clicking the issue count per sprint. Fixed filtering in the Kanban view to ensure JQL queries correctly respect the selected PI and swimlanes.
  • Roadmaps: Fixed a timezone-related issue that caused overlapping issues when users in different timezones edited the roadmap or planned start/end dates.

For further informations about this release, please refer to our release notes page:
Version 4.6.0

4.6.0-jira9 800200253490 2025-10-15 Jira Data Center 9.4.0 - 9.17.5 datacenter Pending
Release Notes:

Cloud Migration

  • Planned dates for issues displayed on the Roadmap are now included when migrating to Agile Hive on Jira Cloud.

Bugfixes

  • Team Breakout Board: Resolved several issues related to the art-issues API call and improved the performance of the Unplanned Issues sidebar retrieval logic.
  • Team Report: Enhanced JQL filters executed when clicking the issue count per sprint. Fixed filtering in the Kanban view to ensure JQL queries correctly respect the selected PI and swimlanes.
  • Roadmaps: Fixed a timezone-related issue that caused overlapping issues when users in different timezones edited the roadmap or planned start/end dates.

For further informations about this release, please refer to our release notes page:
Version 4.6.0

4.5.1-jira10 800200253410 2025-09-09 Jira Data Center 10.0.0 - 10.7.4 datacenter Pending
Release Notes:
  • Roadmaps: Issues with start dates later than end dates now have their dates swapped in the UI for correct display.
  • Reports: Team member profile links now work correctly when the Jira context path differs from /jira.
  • Portfolio Reports: Portfolio Report now works as intended with multiple portfolio projects in the project hierarchy.
  • Fixed issue tooltip on hover not displaying anymore.
  • Fixed 'Multiple projects in board filter' health check to correctly handle complex JQLs matching issues from multiple projects.
  • Fixed cluster-wide cache not clearing when 'Recreate Missing Sprints' was clicked, preventing inconsistent data between Jira nodes.

For further informations about this release, please refer to our release notes page:
Version 4.5.1

4.5.1-jira9 800200253390 2025-09-09 Jira Data Center 9.4.0 - 9.17.5 datacenter Pending
Release Notes:
  • Roadmaps: Issues with start dates later than end dates now have their dates swapped in the UI for correct display.
  • Reports: Team member profile links now work correctly when the Jira context path differs from /jira.
  • Portfolio Reports: Portfolio Report now works as intended with multiple portfolio projects in the project hierarchy.
  • Fixed issue tooltip on hover not displaying anymore.
  • Fixed 'Multiple projects in board filter' health check to correctly handle complex JQLs matching issues from multiple projects.
  • Fixed cluster-wide cache not clearing when 'Recreate Missing Sprints' was clicked, preventing inconsistent data between Jira nodes.

For further informations about this release, please refer to our release notes page:
Version 4.5.1

4.5.0-jira10 800200253350 2025-07-30 Jira Data Center 10.0.0 - 10.6.1 datacenter Pending
Release Notes:
  • ART Planning Board: Dependent features from other ARTs will be displayed according to the calculated iteration they will be finished in. No need to set the Due Date on these issues anymore.
  • Breakout Board & Roadmaps: Users without the permission to link issues can no longer set dependencies.
  • The warning icon on the ART Planning Board is not displayed any more if the required external issue is planned within the same timeframe of a PI.
  • Team Report: "Issues without Sprints" does not show Objectives and Risks anymore.
  • ART Planning Board: We have corrected the color of the dependency line if there is a mismatch between Sprint and Due Date.
  • Fixed a bug where an PSQLException occurs in issue events when calculating PIs in PostgreSQL databases.

For further informations about this release, please refer to our release notes page:
Version 4.5.0

4.5.0-jira9 800200253340 2025-07-30 Jira Data Center 9.4.0 - 9.17.5 datacenter Pending
Release Notes:
  • ART Planning Board: Dependent features from other ARTs will be displayed according to the calculated iteration they will be finished in. No need to set the Due Date on these issues anymore.
  • Breakout Board & Roadmaps: Users without the permission to link issues can no longer set dependencies.
  • The warning icon on the ART Planning Board is not displayed any more if the required external issue is planned within the same timeframe of a PI.
  • Team Report: "Issues without Sprints" does not show Objectives and Risks anymore.
  • ART Planning Board: We have corrected the color of the dependency line if there is a mismatch between Sprint and Due Date.
  • Fixed a bug where an PSQLException occurs in issue events when calculating PIs in PostgreSQL databases.

For further informations about this release, please refer to our release notes page:
Version 4.5.0

4.4.0-jira10 800200253290 2025-07-02 Jira Data Center 10.0.0 - 10.6.1 datacenter Pending
Release Notes:
  • Team Report: All issues assigned to a PI can now also be displayed in a Kanban-like board, grouping issues by their status.
  • Adjusted the calculation for the overall SP value in the widget and the Burn Up Chart on Team level. Both now include every issue assigned to the currently displayed PI (as also displayed in the "Issues without sprint" box).
  • Roadmaps support unlimited rows now. It's now possible to plan issues even if a JQL filter is currently active. When deactivating the filter again, previously not visible issues could have been displaced by the drag operations.
  • Fixed the mechanism to push overlapping issues on the Roadmap into the next row.
  • ART Planning Board: The warning icon is no longer displayed in the current PI when a child issue is carried over from the previous PI after closing a sprint.
  • Includes a compatibility release for Jira 10 for AutoPage.

For further informations about this release, please refer to our release notes page:
Version 4.4.0

4.4.0-jira9 800200253280 2025-07-02 Jira Data Center 9.4.0 - 9.17.5 datacenter Pending
Release Notes:
  • Team Report: All issues assigned to a PI can now also be displayed in a Kanban-like board, grouping issues by their status.
  • Adjusted the calculation for the overall SP value in the widget and the Burn Up Chart on Team level. Both now include every issue assigned to the currently displayed PI (as also displayed in the "Issues without sprint" box).
  • Roadmaps support unlimited rows now. It's now possible to plan issues even if a JQL filter is currently active. When deactivating the filter again, previously not visible issues could have been displaced by the drag operations.
  • Fixed the mechanism to push overlapping issues on the Roadmap into the next row.
  • ART Planning Board: The warning icon is no longer displayed in the current PI when a child issue is carried over from the previous PI after closing a sprint.
  • Includes a compatibility release for Jira 10 for AutoPage.

For further informations about this release, please refer to our release notes page:
Version 4.4.0

4.3.1-jira10 800200253210 2025-05-16 Jira Data Center 10.0.0 - 10.4.1 datacenter Pending
Release Notes:

Bugfixes:

  • Fixed an issue that prevented Solution Train, ART, and Team Reports from loading properly.

Improvements:

  • Objective sorting by Planned Business Value now correctly sorts null values to the end of the list.

For further informations about this release, please refer to our release notes page:
https://seibert.biz/agile-hive-release-notes#AgileHiveReleaseNotes-v4.3.1

4.3.1-jira9 800200253200 2025-05-16 Jira Data Center 9.4.0 - 9.17.5 datacenter Pending
Release Notes:

Bugfixes:

  • Fixed an issue that prevented Solution Train, ART, and Team Reports from loading properly.

Improvements:

  • Objective sorting by Planned Business Value now correctly sorts null values to the end of the list.

For further informations about this release, please refer to our release notes page:
https://seibert.biz/agile-hive-release-notes#AgileHiveReleaseNotes-v4.3.1

4.3.0-jira10 800200253170 2025-05-12 Jira Data Center 10.0.0 - 10.4.1 datacenter Pending
Release Notes:

Features and Improvements

  • The Breakout Board now shows External Dependencies to issues outside of the ART.
  • Team Report shows issues which have the currently selected PI but no matching sprint assigned. These are grouped in an "Issues without iteration" box.
  • Breakout Board and ART Planning Board show year in column headers.
  • Team Report Objective Widget displays Objectives in descending order of their Plan Business Value now.
  • Changed display of Story Point Bubbles in Team Report and moved "over capacity" warning to capacity bubble instead of planned bubble.
  • Fixed tooltip for Story Points per Day gauge.
  • Allow-listed method calls in velocity templates to prevent WARN messages in log files.

For further informations about this release, please refer to our release notes page: https://seibert.biz/agile-hive-release-notes#AgileHiveReleaseNotes-v4.3.0

4.3.0-jira9 800200253160 2025-05-09 Jira Data Center 9.4.0 - 9.17.5 datacenter Pending
Release Notes:

Features and Improvements

  • The Breakout Board now shows External Dependencies to issues outside of the ART.
  • Team Report shows issues which have the currently selected PI but no matching sprint assigned. These are grouped in an "Issues without iteration" box.
  • Breakout Board and ART Planning Board show year in column headers.
  • Team Report Objective Widget displays Objectives in descending order of their Plan Business Value now.
  • Changed display of Story Point Bubbles in Team Report and moved "over capacity" warning to capacity bubble instead of planned bubble.
  • Fixed tooltip for Story Points per Day gauge.
  • Allow-listed method calls in velocity templates to prevent WARN messages in log files.

For further informations about this release, please refer to our release notes page: https://seibert.biz/agile-hive-release-notes#AgileHiveReleaseNotes-v4.3.0

4.2.0-jira10 800200253120 2025-04-14 Jira Data Center 10.0.0 - 10.4.1 datacenter Pending
Release Notes:

Feature

  • Issues on the Overview section of the Portfolio, Solution and ART Report can be expanded now. This will load all child issues of this parent. If it's on Solution or ART Report, only children in the same PI will be shown.

Bugfixes

  • BUC: Changed Forecast calculation to Story Points per Days instead of Velocity to avoid peaks from the past Sprints and make the forecast more understandable.
  • BUC: Fixed a bug where the difference between the forecasted and overall planned Story Points was wrong.
  • BUC: Fixed a bug where at high velocity the forecast could point in the past.
  • ART Planning Board: Fixed a bug where dependency lines where missing when an ART issue had a circular dependency with two Non-ART issues.
  • Roadmaps: Support up to 200 rows now.
  • Breakout Board: Renamed occurrence of "Program" to "ART" in tooltip.

For further informations about this release, please refer to our release notes page: https://seibert.biz/agile-hive-release-notes#AgileHiveReleaseNotes-v4.2.0

4.2.0-jira9 800200253110 2025-04-14 Jira Data Center 9.4.0 - 9.17.5 datacenter Pending
Release Notes:

Feature

  • Issues on the Overview section of the Portfolio, Solution and ART Report can be expanded now. This will load all child issues of this parent. If it's on Solution or ART Report, only children in the same PI will be shown.

Bugfixes

  • BUC: Changed Forecast calculation to Story Points per Days instead of Velocity to avoid peaks from the past Sprints and make the forecast more understandable.
  • BUC: Fixed a bug where the difference between the forecasted and overall planned Story Points was wrong.
  • BUC: Fixed a bug where at high velocity the forecast could point in the past.
  • ART Planning Board: Fixed a bug where dependency lines where missing when an ART issue had a circular dependency with two Non-ART issues.
  • Roadmaps: Support up to 200 rows now.
  • Breakout Board: Renamed occurrence of "Program" to "ART" in tooltip.

For further informations about this release, please refer to our release notes page: https://seibert.biz/agile-hive-release-notes#AgileHiveReleaseNotes-v4.2.0

4.1.0-jira9 800200253030 2025-03-13 Jira Data Center 9.4.0 - 9.17.5 datacenter Pending
Release Notes:

Features

  • Introduced new issue types for Epics in Agile Hive: Team Epic, ART Epic, Solution Train Epic
  • IMPORTANT: These must be added to your existing Issue Type Schemes
  • These Epics can be linked with the Agile Hive Link to issues from the same project
  • Team Epics can be used like ART issues on the Breakout Board
  • Shared Service Teams are allowed to link to Team Epics
  • More details can be found here: Using Epics in Agile Hive
  • Migrate to Agile Hive Cloud soon? Follow this article here: Cloud Migration Prerequisites

Bugfixes

  • Fixed a bug where dependencies between ART issues could not be displayed when a child issue was in a Sprint with no start and end dates
  • Fixed a bug where boards with Custom Epic Panel could not be loaded when non-ascii characters where used in the issue names
  • Also contains fixes from v. 4.0.1 which is now private

For further informations about this release, please refer to our release notes page: https://seibert.biz/agile-hive-release-notes#AgileHiveReleaseNotes-v4.1.0

4.1.0-jira10 800200253010 2025-03-13 Jira Data Center 10.0.0 - 10.4.1 datacenter Pending
Release Notes:

Features

  • Introduced new issue types for Epics in Agile Hive: Team Epic, ART Epic, Solution Train Epic
  • IMPORTANT: These must be added to your existing Issue Type Schemes
  • These Epics can be linked with the Agile Hive Link to issues from the same project
  • Team Epics can be used like ART issues on the Breakout Board
  • Shared Service Teams are allowed to link to Team Epics
  • More details can be found here: Using Epics in Agile Hive
  • Migrate to Agile Hive Cloud soon? Follow this article here: Cloud Migration Prerequisites

Bugfixes

  • Fixed a bug where dependencies between ART issues could not be displayed when a child issue was in a Sprint with no start and end dates
  • Fixed a bug where boards with Custom Epic Panel could not be loaded when non-ascii characters where used in the issue names

Other

  • DC Approval 2025
  • Updated dependencies

For further informations about this release, please refer to our release notes page: https://seibert.biz/agile-hive-release-notes#AgileHiveReleaseNotes-v4.1.0

4.0.1-jira10 800200252900 2025-02-20 Jira Data Center 10.0.0 - 10.4.1 datacenter Pending
Release Notes:
  • Fixed a bug where only users with admin permissions could view the Agile Hive Roadmaps in Jira 10
  • Fixed a bug where the loading spinner would remain visible, when only Independent issues were present on the Breakout Board
  • Fixed a bug where the dependency line between two issues from different ARTs could not be drawn
  • Fixed a Javascript error on the Project Hierarchies view, when moving multiple projects around and re-connecting them to different parents
  • Fixed a bug in Custom Epic Panel, where configurations with more than 1000 boards could not be edited or removed, when an oracle database was used for Jira.

For further informations about this release, please refer to our release notes page: https://seibert.biz/agile-hive-release-notes#AgileHiveReleaseNotes-v4.0.1

4.0.0-jira10 800200252850 2025-01-31 Jira Data Center 10.0.0 - 10.4.1 datacenter Pending
Release Notes:

With Version 4.0.0 we provide compatibility for Jira 10.

We also fixed a bug where Custom Epic Panel would demand an own license since one of our last releases.

For further informations about this release, please refer to our release notes page: https://seibert.biz/agile-hive-release-notes#AgileHiveReleaseNotes-v4.0.0

4.0.0-jira9 800200252830 2025-01-31 Jira Data Center 9.4.0 - 9.17.5 datacenter Pending
Release Notes:

With Version 4.0.0 we provide compatibility for Jira 10.

We also fixed a bug where Custom Epic Panel would demand an own license since one of our last releases.

For further informations about this release, please refer to our release notes page: https://seibert.biz/agile-hive-release-notes#AgileHiveReleaseNotes-v4.0.0

3.73.0 800200252740 2025-01-15 Jira Data Center 9.4.0 - 9.17.5 datacenter Pending
Release Notes:

Features:

  • The issues on Team Reports can now be filtered by a custom JQL query.
  • The PI Overview on Solution and ART Reports has been rebuilt and now features a new look and feel.

Bugfixes:

  • Fixed the quick filters for ART issues on the Breakout Board, which were incorrectly fetched from Team Boards instead of ART Boards.
  • Fixed a bug where setting the PI directly when creating a new ART issue caused the issue not to appear on the ART Report.
  • Changing a Sprint name after PI creation now correctly updates the Sprint lozenges on all Jira and Agile Hive views.
3.73.0 800200252730 2025-01-15 Jira Server 9.4.0 - 9.17.5 server Pending
Release Notes:

Features:

  • The issues on Team Reports can now be filtered by a custom JQL query.
  • The PI Overview on Solution and ART Reports has been rebuilt and now features a new look and feel.

Bugfixes:

  • Fixed the quick filters for ART issues on the Breakout Board, which were incorrectly fetched from Team Boards instead of ART Boards.
  • Fixed a bug where setting the PI directly when creating a new ART issue caused the issue not to appear on the ART Report.
  • Changing a Sprint name after PI creation now correctly updates the Sprint lozenges on all Jira and Agile Hive views.
3.72.3 800200252680 2024-12-11 Jira Server 8.6.0 - 9.17.5 server Pending
Release Notes:
  • Removed direct print capability and printer configuration in InstaPrinta due to security reasons.
  • Removed vulnerable dependencies for InstaPrinta (along with the direct print function).
  • Fixed a bug where the JQL filter did not work when "Hide parents" was active on Solution Train Reports.
  • Fixed a bug where the "Planning Interval in currentPiForArt" function caused a compilation error when using the issueFunction aggregateExpression provided by ScriptRunner.
  • Fixed a bug on Jira versions > 9.6 where issuekeys on Kanban boards are no longer clickable when Custom Epic Panel is configured for this board.
  • Fixed a bug where a Solution Train report or view could not be loaded when an empty/orphaned Solution Train PI for this project existed in the database.
  • IMPORTANT: Beginning with the next version in 2025, we will reduce the range of compatible Jira versions for Agile Hive to 9.4 up to the latest versions.
3.72.3 800200252690 2024-12-10 Jira Data Center 8.6.0 - 9.17.5 datacenter Pending
Release Notes:
  • Removed direct print capability and printer configuration in InstaPrinta due to security reasons.
  • Removed vulnerable dependencies for InstaPrinta (along with the direct print function).
  • Fixed a bug where the JQL filter did not work when "Hide parents" was active on Solution Train Reports.
  • Fixed a bug where the "Planning Interval in currentPiForArt" function caused a compilation error when using the issueFunction aggregateExpression provided by ScriptRunner.
  • Fixed a bug on Jira versions > 9.6 where issuekeys on Kanban boards are no longer clickable when Custom Epic Panel is configured for this board.
  • Fixed a bug where a Solution Train report or view could not be loaded when an empty/orphaned Solution Train PI for this project existed in the database.
  • IMPORTANT: Beginning with the next version in 2025, we will reduce the range of compatible Jira versions for Agile Hive to 9.4 up to the latest versions.
3.72.1 800200252650 2024-11-15 Jira Data Center 8.6.0 - 9.17.5 datacenter Pending
Release Notes:
  • The "Unplanned Issues" backlogs on Breakout Board and Roadmap are now search- and sortable by JQL.
  • The issues in PI Overview component on ART and Solution Train Reports are now sortable via JQL when "Hide Parents" is active.
  • Feature filter on the Breakout Board uses JQL now to filter Features. This fixed a bug where only previously expanded Teams where considered for the Feature filter.
  • Fixed a bug where Shared Service Team issues were not shown on the Breakout Board when the Shared Service Team did not have a Jira Board (Rapidview).
  • Fixed a bug where adding multiple Quick Filters did not work.
  • Fixed a bug where brackets around quick filters prevented queries starting with "ORDER BY" from working.
  • Fixed a bug where the projects in the top navigation menu did not follow the alphabetical order anymore.
  • Prevented creation of Planning Intervals from Team projects.
  • Added menu entry, functionality and test interface for Agile Hive Cloud migration.
3.72.1 800200252640 2024-11-15 Jira Server 8.6.0 - 9.17.5 server Pending
Release Notes:
  • The "Unplanned Issues" backlogs on Breakout Board and Roadmap are now search- and sortable by JQL.
  • The issues in PI Overview component on ART and Solution Train Reports are now sortable via JQL when "Hide Parents" is active.
  • Feature filter on the Breakout Board uses JQL now to filter Features. This fixed a bug where only previously expanded Teams where considered for the Feature filter.
  • Fixed a bug where Shared Service Team issues were not shown on the Breakout Board when the Shared Service Team did not have a Jira Board (Rapidview).
  • Fixed a bug where adding multiple Quick Filters did not work.
  • Fixed a bug where brackets around quick filters prevented queries starting with "ORDER BY" from working.
  • Fixed a bug where the projects in the top navigation menu did not follow the alphabetical order anymore.
  • Prevented creation of Planning Intervals from Team projects.
  • Added menu entry, functionality and test interface for Agile Hive Cloud migration.
3.71.0 800200252590 2024-10-23 Jira Data Center 8.6.0 - 9.17.5 datacenter Pending
Release Notes:

Features & Improvements

  • Introduced a "Show/Hide Parents" button to toggle the visibility of parent issues in both ART and Solution Reports.
  • Added a warning message in the Planning Interval creation/editing dialog to alert users when their Planning Interval name exceeds the character limit, which may result in truncated Sprint names.

Bug Fixes

  • Resolved a potential NullPointerException that could occur during Manual Recalculation.
  • Fixed a JavaScript error that could appear when issues were reordered in the backlog while using the Custom Epic Panel.
  • Corrected an issue where dependency lines were not displayed when utilizing a custom dependency link type.
  • Addressed an error with date fields in the PI creation/editing dialog that could slow down the UI when date fields were modified via keyboard input.
3.71.0 800200252580 2024-10-23 Jira Server 8.6.0 - 9.17.5 server Pending
Release Notes:

Features & Improvements

  • Introduced a "Show/Hide Parents" button to toggle the visibility of parent issues in both ART and Solution Reports.
  • Added a warning message in the Planning Interval creation/editing dialog to alert users when their Planning Interval name exceeds the character limit, which may result in truncated Sprint names.

Bug Fixes

  • Resolved a potential NullPointerException that could occur during Manual Recalculation.
  • Fixed a JavaScript error that could appear when issues were reordered in the backlog while using the Custom Epic Panel.
  • Corrected an issue where dependency lines were not displayed when utilizing a custom dependency link type.
  • Addressed an error with date fields in the PI creation/editing dialog that could slow down the UI when date fields were modified via keyboard input.
3.70.0 800200252550 2024-09-26 Jira Data Center 8.6.0 - 9.17.5 datacenter Pending
Release Notes:

Features & Improvements

  • Agile Hive supports multiple independent SAFe configurations in the project hierarchies and the top navigation now (Multi Hive). Shared Services are shared across all different hives.
  • The issues in the (PI) overview section of the ART, Solution and Portfolio Reports can be filtered now by using custom JQL as well as quick filters.
  • The Unplanned Issues Backlogs in the Breakout Board and the Roadmap now support ORDER BY clauses in the Quick Filters.
  • Added a JQL-function for current PI: "Planning Interval" in currentPiForArt(KEY).
  • Extended the Fibonacci-Value range to support 100.
  • Limited the Manual Recalculation in the Project Settings to Jira and System Administrators, to match the global Manual Recalculation in the admin section.

Bugfixes

  • Team Breakout Board: Fixed a bug where a removed feature swimlane would reappear once the board was reloaded.
3.70.0 800200252540 2024-09-26 Jira Server 8.6.0 - 9.17.5 server Pending
Release Notes:

Features & Improvements

  • Agile Hive supports multiple independent SAFe configurations in the project hierarchies and the top navigation now (Multi Hive). Shared Services are shared across all different hives.
  • The issues in the (PI) overview section of the ART, Solution and Portfolio Reports can be filtered now by using custom JQL as well as quick filters.
  • The Unplanned Issues Backlogs in the Breakout Board and the Roadmap now support ORDER BY clauses in the Quick Filters.
  • Added a JQL-function for current PI: "Planning Interval" in currentPiForArt(KEY).
  • Extended the Fibonacci-Value range to support 100.
  • Limited the Manual Recalculation in the Project Settings to Jira and System Administrators, to match the global Manual Recalculation in the admin section.

Bugfixes

  • Team Breakout Board: Fixed a bug where a removed feature swimlane would reappear once the board was reloaded.
3.69.0 800200252480 2024-09-03 Jira Data Center 8.6.0 - 9.17.5 datacenter Pending
Release Notes:
  • It is now possible to edit the currently running PI. The end date can be moved further in the future or closer to the current date, the start date can’t be changed. The amount of iterations can changed, but past iterations can not be edited.
  • JQL-Autocomplete shows ART project names in suggestions for PIs now.
  • Collapse and expand all parent issues on the ART, Solution and Portfolio-Reports.
  • The nightly cron job for the recalculation of all properties and the configuration for this has been removed. Active jobs will be unscheduled, too, as Jira would keep them running if not explicitly unscheduled.
  • Fixed a bug where the load of Shared Service Teams was added to the (standard) Teams' load and compared to their capacity.
  • Fixed a bug where a project was still displayed as Shared Service Team after it had been removed from the Shared Service Teams. NOTE: In order to also remove the Story Points from the linked issues execute a recalculation of affected ARTs.
3.69.0 800200252470 2024-09-03 Jira Server 8.6.0 - 9.17.5 server Pending
Release Notes:
  • It is now possible to edit the currently running PI. The end date can be moved further in the future or closer to the current date, the start date can’t be changed. The amount of iterations can changed, but past iterations can not be edited.
  • JQL-Autocomplete shows ART project names in suggestions for PIs now.
  • Collapse and expand all parent issues on the ART, Solution and Portfolio-Reports.
  • The nightly cron job for the recalculation of all properties and the configuration for this has been removed. Active jobs will be unscheduled, too, as Jira would keep them running if not explicitly unscheduled.
  • Fixed a bug where the load of Shared Service Teams was added to the (standard) Teams' load and compared to their capacity.
  • Fixed a bug where a project was still displayed as Shared Service Team after it had been removed from the Shared Service Teams. NOTE: In order to also remove the Story Points from the linked issues execute a recalculation of affected ARTs.
3.68.0 800200252430 2024-08-16 Jira Data Center 8.6.0 - 9.17.5 datacenter Pending
Release Notes:
  • Shared Service Teams involved in a feature will also be displayed on the Team Breakout Board and the Team Breakout Overview
  • Added quick filters to the JQL autocomplete filter. A selected quick filter will execute a JQL search directly
  • PI Dropdown: made list of PIs scrollable if more than six Pis exist
  • Reports: Kept the "Overview" header of reports visible on screen when the data container is scrolled up
  • Reports: strike out ART objective key for closed objectives
  • ART Planning Board: Used Shared Service label instead of External when dependency is from Shared Service Team
  • ART Planning Board: for issues with external dependencies the sprint end date is now prioritized higher than the due date in which iteration the issue is displayed
  • Roadmap: removed "Create your first PI" dialog if no PI exists
  • Roadmap: fixed JS error when the mouse pointer is over the header and the data has not been loaded yet
  • Loading icon on Breakout Board waits for issues to be loaded when Team is expanded
3.68.0 800200252420 2024-08-16 Jira Server 8.6.0 - 9.17.5 server Pending
Release Notes:
  • Shared Service Teams involved in a feature will also be displayed on the Team Breakout Board and the Team Breakout Overview
  • Added quick filters to the JQL autocomplete filter. A selected quick filter will execute a JQL search directly
  • PI Dropdown: made list of PIs scrollable if more than six Pis exist
  • Reports: Kept the "Overview" header of reports visible on screen when the data container is scrolled up
  • Reports: strike out ART objective key for closed objectives
  • ART Planning Board: Used Shared Service label instead of External when dependency is from Shared Service Team
  • ART Planning Board: for issues with external dependencies the sprint end date is now prioritized higher than the due date in which iteration the issue is displayed
  • Roadmap: removed "Create your first PI" dialog if no PI exists
  • Roadmap: fixed JS error when the mouse pointer is over the header and the data has not been loaded yet
  • Loading icon on Breakout Board waits for issues to be loaded when Team is expanded
3.67.0 800200252350 2024-07-19 Jira Data Center 8.6.0 - 9.17.5 datacenter Pending
Release Notes:
  • Create PIs for all ARTs in your Solution Train at once.
  • Improved loading time for Team Breakout Boards by only loading the primary team. Expanding other teams will load their issues on-demand.
  • Recalculate properties for a Portfolio project and its children from Portfolio's Project Settings.
  • Fixed sorting of Issue Keys with multi-digit numbers on Team Report.
  • Fixed a bug where a warning icon on Planning Board did not disappear after removing a dependency.
  • Fixed a bug where the ART Planning Board failed to load when a feature had an external dependency to a team issue without a parent ART.
  • Fixed a bug affecting the PI field of Team Issues of a deleted ART.
  • Archived issues are no longer included in the Burn-up Chart recalculation.

IMPORTANT: Please perform a project or complete property recalculation in order to view Dependencies on the Breakout Board and Roadmap.

Please note: With the upcoming release 3.69, we will remove the Cron Job which recalculates our properties on a nightly basis.

3.67.0 800200252340 2024-07-19 Jira Server 8.6.0 - 9.17.5 server Pending
Release Notes:
  • Create PIs for all ARTs in your Solution Train at once.
  • Improved loading time for Team Breakout Boards by only loading the primary team. Expanding other teams will load their issues on-demand.
  • Recalculate properties for a Portfolio project and its children from Portfolio's Project Settings.
  • Fixed sorting of Issue Keys with multi-digit numbers on Team Report.
  • Fixed a bug where a warning icon on Planning Board did not disappear after removing a dependency.
  • Fixed a bug where the ART Planning Board failed to load when a feature had an external dependency to a team issue without a parent ART.
  • Fixed a bug affecting the PI field of Team Issues of a deleted ART.
  • Archived issues are no longer included in the Burn-up Chart recalculation.

IMPORTANT: Please perform a project or complete property recalculation in order to view Dependencies on the Breakout Board and Roadmap.

Please note: With the upcoming release 3.69, we will remove the Cron Job which recalculates our properties on a nightly basis.

3.66.3 800200252320 2024-07-05 Jira Data Center 8.6.0 - 9.15.2 datacenter Pending
Release Notes:
  • Fixed the possibility for a failing upgrade task when a Sprint or Board of Agile Hive would have been deleted.
  • Fixed an upgrade task which migrates Business Value fields, so that it now only migrates values, for whom no new values where set after failed upgrade tasks.
  • Updated Custom Epic Panel to 2.9.0, fixing a bug where creating an Issues with selected Issue in Custom Epic Panel would not work, when the Jira would not have the context path "/jira" within its URL.
  • Updated AutoPage to Version 2.24.0, fixing a bug that occurred on AutoPage page creation when a Jira user could not be found in Confluence.

Important note: A reindex might be necessary, for the change on the Business Value fields to work.

3.66.3 800200252310 2024-07-05 Jira Server 8.6.0 - 9.15.2 server Pending
Release Notes:
  • Fixed the possibility for a failing upgrade task when a Sprint or Board of Agile Hive would have been deleted.
  • Fixed an upgrade task which migrates Business Value fields, so that it now only migrates values, for whom no new values where set after failed upgrade tasks.
  • Updated Custom Epic Panel to 2.9.0, fixing a bug where creating an Issues with selected Issue in Custom Epic Panel would not work, when the Jira would not have the context path "/jira" within its URL.
  • Updated AutoPage to Version 2.24.0, fixing a bug that occurred on AutoPage page creation when a Jira user could not be found in Confluence.

Important note: A reindex might be necessary, for the change on the Business Value fields to work.

3.66.2 800200252260 2024-06-19 Jira Data Center 8.6.0 - 9.15.2 datacenter Pending
Release Notes:

We fixed the possibility for a failing upgrade task when the start or end date of Sprints were not set (i. e. null values in data base).

This error meant that in this case all upgrade tasks newer than August 2023 were not executed (including the migration of the business CFs). This will be corrected with this hotfix.

3.66.2 800200252250 2024-06-19 Jira Server 8.6.0 - 9.15.2 server Pending
Release Notes:

We fixed the possibility for a failing upgrade task when the start or end date of Sprints were not set (i. e. null values in data base).

This error meant that in this case all upgrade tasks newer than August 2023 were not executed (including the migration of the business CFs). This will be corrected with this hotfix.

3.66.1 800200252150 2024-05-22 Jira Data Center 8.6.0 - 9.15.2 datacenter Pending
Release Notes:
  • Health Check warnings will only be shown to administrators and project administrators.
  • New Health Check page in Agile Hive admin section.
  • Fixed a bug in the PI customfield where the field could not be set on Team issues when no parent issue was linked.
3.66.1 800200252140 2024-05-22 Jira Server 8.6.0 - 9.15.2 server Pending
Release Notes:
  • Health Check warnings will only be shown to administrators and project administrators.
  • New Health Check page in Agile Hive admin section.
  • Fixed a bug in the PI customfield where the field could not be set on Team issues when no parent issue was linked.
3.66.0 800200252100 2024-04-29 Jira Data Center 8.6.0 - 9.15.2 datacenter Pending
Release Notes:
  • In Project Hierarchy in the Agile Hive Settings, it's now possible to mark projects in Jira as Shared Service Teams.
  • Once marked as Shared Service Team, issues from this project can be linked to features from different ART projects using the Agile Hive Hierarchy link.
  • The Teams Involved field supports Shared Service Teams and also calculates the value by looking at linked issues.
  • If a Shared Service project has the Planning Interval field configured in its issue types' screen schemes, the PI field can be set either manually depending on the parent issue or it will be calculated depending on Due Date or Sprint.
  • Shared Service Team issues will display their hierarchical context in the issue's sidebar.
  • ART reports will display the Shared Service Teams that contribute to this ART's features and enablers. To be considered for a certain PI, set the PI field on Shared Service Team issues, or they must be planned in sprints or need to have a Due Date set, that correlates with the PI.
3.66.0 800200252090 2024-04-29 Jira Server 8.6.0 - 9.15.2 server Pending
Release Notes:
  • In Project Hierarchy in the Agile Hive Settings, it's now possible to mark projects in Jira as Shared Service Teams.
  • Once marked as Shared Service Team, issues from this project can be linked to features from different ART projects using the Agile Hive Hierarchy link.
  • The Teams Involved field supports Shared Service Teams and also calculates the value by looking at linked issues.
  • If a Shared Service project has the Planning Interval field configured in its issue types' screen schemes, the PI field can be set either manually depending on the parent issue or it will be calculated depending on Due Date or Sprint.
  • Shared Service Team issues will display their hierarchical context in the issue's sidebar.
  • ART reports will display the Shared Service Teams that contribute to this ART's features and enablers. To be considered for a certain PI, set the PI field on Shared Service Team issues, or they must be planned in sprints or need to have a Due Date set, that correlates with the PI.
3.65.4 800200252060 2024-04-10 Jira Data Center 8.6.0 - 9.14.1 datacenter Pending
Release Notes:
  • Added support for Jira up to 9.14
  • Fixed a bug, where the issue move operation in Jira would not work for an issue with the "Plan-" or "Actual Business Value" custom fields.
3.65.4 800200252050 2024-04-10 Jira Server 8.6.0 - 9.14.1 server Pending
Release Notes:
  • Added support for Jira up to 9.14
  • Fixed a bug, where the issue move operation in Jira would not work for an issue with the "Plan-" or "Actual Business Value" custom fields.
3.65.3 800200252010 2024-03-27 Jira Data Center 8.6.0 - 9.12.15 datacenter Pending
Release Notes:
  • Fixed a bug in the manual re-calculation, which would raise an IllegalArgumentException, when not using a full SAFe configuration within Agile Hive.
  • Fixed a JavaScript error, which occurred on some Jira versions, when viewing Jira Scrum and Kanban Boards.
  • Fixed a visual bug, where the collapse chevron for issues would disappear, once they where collapsed via the "Collapse Issues" button on the Breakout Board and Breakout Overview.
  • Added the "Breakout Overview" menu item to the Agile Hive header, when a team level is viewed.
  • Removed "(Beta)" from the "ART Kanban" menu item.
3.65.3 800200252000 2024-03-27 Jira Server 8.6.0 - 9.12.15 server Pending
Release Notes:
  • Fixed a bug in the manual re-calculation, which would raise an IllegalArgumentException, when not using a full SAFe configuration within Agile Hive.
  • Fixed a JavaScript error, which occurred on some Jira versions, when viewing Jira Scrum and Kanban Boards.
  • Fixed a visual bug, where the collapse chevron for issues would disappear, once they where collapsed via the "Collapse Issues" button on the Breakout Board and Breakout Overview.
  • Added the "Breakout Overview" menu item to the Agile Hive header, when a team level is viewed.
  • Removed "(Beta)" from the "ART Kanban" menu item.
3.65.2 800200251980 2024-03-21 Jira Data Center 8.6.0 - 9.12.15 datacenter Pending
Release Notes:
  • More descriptive "Issues without parent" section
  • Agile Hive navigation menu is now scrollable
  • Some minor performance improvements while handling with projects and layers
  • Minor improvements to the property calculation
  • Fixed a JS error on the Breakout Board
  • Fixed a bug with the Breakout Board when the ART project didn't have any Jira board connected with it. Introduced Health Check to warn users when no Jira board is connected to ART projects
  • Fixed a bug in combination with the Agile Tools and Filters plugin
  • Fixed a bug on the ART Planning Board with dependencies outside of the current PI
  • Fixed upgrade task for WSJF values
  • Contains enabling functionality for the project-based re-calculation of properties (hidden until the actual feature release)
  • Improved issue link migration to Agile Hive Cloud
  • Fixed sorting of "Actual" & "Plan Business Value" custom field values after a JQL search.
  • An upgrade task will be running during the installation. Please perform a background re-index afterwards
3.65.2 800200251970 2024-03-21 Jira Server 8.6.0 - 9.12.15 server Pending
Release Notes:
  • More descriptive "Issues without parent" section
  • Agile Hive navigation menu is now scrollable
  • Some minor performance improvements while handling with projects and layers
  • Minor improvements to the property calculation
  • Fixed a JS error on the Breakout Board
  • Fixed a bug with the Breakout Board when the ART project didn't have any Jira board connected with it. Introduced Health Check to warn users when no Jira board is connected to ART projects
  • Fixed a bug in combination with the Agile Tools and Filters plugin
  • Fixed a bug on the ART Planning Board with dependencies outside of the current PI
  • Fixed upgrade task for WSJF values
  • Contains enabling functionality for the project-based re-calculation of properties (hidden until the actual feature release)
  • Improved issue link migration to Agile Hive Cloud
  • Fixed sorting of "Actual" & "Plan Business Value" custom field values after a JQL search.
  • An upgrade task will be running during the installation. Please perform a background re-index afterwards
3.65.1 800200251890 2024-02-07 Jira Data Center 8.6.0 - 9.12.31 datacenter Pending
Release Notes:
  • Introducing asynchronous loading for report statistics using a loading skeleton as a placeholder.
  • Previously, ongoing property calculations hindered Agile Hive plugin updates, requiring Jira shutdowns for successful updates. We made the property worker more resilient so that an update of the plugin works now as expected.
  • Fixed a bug limiting users with only start/complete sprints permissions from starting and completing Sprints due to timestamp issues when creating Planning Intervals.
  • Further improvement of the property calculations by eliminating the need to calculate independent team issues every time an issue changes. We now calculate those only when users open the report pages.
  • The Public API's Iteration data transfer object now includes the ID field.
  • For milestone creation, date formats are now language-dependent, with known issues for Chinese, Spanish, Finnish, Norwegian, and Romanian formats (here you have to use the date picker!)
  • Fixed performance problems introduced in 3.65.0.
3.65.1 800200251880 2024-02-07 Jira Server 8.6.0 - 9.12.31 server Pending
Release Notes:
  • Introducing asynchronous loading for report statistics using a loading skeleton as a placeholder.
  • Previously, ongoing property calculations hindered Agile Hive plugin updates, requiring Jira shutdowns for successful updates. We made the property worker more resilient so that an update of the plugin works now as expected.
  • Fixed a bug limiting users with only start/complete sprints permissions from starting and completing Sprints due to timestamp issues when creating Planning Intervals.
  • Further improvement of the property calculations by eliminating the need to calculate independent team issues every time an issue changes. We now calculate those only when users open the report pages.
  • The Public API's Iteration data transfer object now includes the ID field.
  • For milestone creation, date formats are now language-dependent, with known issues for Chinese, Spanish, Finnish, Norwegian, and Romanian formats (here you have to use the date picker!)
  • Fixed performance problems introduced in 3.65.0.
3.64.3 800200251830 2024-01-02 Jira Data Center 8.6.0 - 9.12.15 datacenter Pending
Release Notes:
  • Added the possibility to select a Primary Board for ART and higher level projects. This board will be used to determine Quick Filters for Roadmap backlogs (and other places in the future).
  • Added an interface for migrating the Agile Hive issue links to an Agile Hive Cloud readable format.
  • Fixed a bug, where on fresh installs of the Agile Hive plugin, Upgrade Tasks, which required the Admin user set (obviously not possible as this is the first install), would fail. On subsequent upgrades, the Upgrade Tasks could run again unnecessarily.
  • Fixed a bug where an alternative Agile Hive Dependency Link did not appear on the ART Planning Board right after it was set via the Jira issue detail view.
  • Fixed a bug where dependencies between ARTs were not shown initially on the Roadmap but needed an "Update data" or an issue change.
  • Fixed a bug where a user without "Edit issues" permission could still drag and drop issues on Breakout Board and Roadmaps.
  • Fixed breaking project names in Agile Hive menu.
3.64.3 800200251820 2024-01-02 Jira Server 8.6.0 - 9.12.15 server Pending
Release Notes:
  • Added the possibility to select a Primary Board for ART and higher level projects. This board will be used to determine Quick Filters for Roadmap backlogs (and other places in the future).
  • Added an interface for migrating the Agile Hive issue links to an Agile Hive Cloud readable format.
  • Fixed a bug, where on fresh installs of the Agile Hive plugin, Upgrade Tasks, which required the Admin user set (obviously not possible as this is the first install), would fail. On subsequent upgrades, the Upgrade Tasks could run again unnecessarily.
  • Fixed a bug where an alternative Agile Hive Dependency Link did not appear on the ART Planning Board right after it was set via the Jira issue detail view.
  • Fixed a bug where dependencies between ARTs were not shown initially on the Roadmap but needed an "Update data" or an issue change.
  • Fixed a bug where a user without "Edit issues" permission could still drag and drop issues on Breakout Board and Roadmaps.
  • Fixed breaking project names in Agile Hive menu.
3.64.2 800200251780 2023-11-30 Jira Data Center 8.6.0 - 9.12.15 datacenter Pending
Release Notes:
  • All plugins are now compatible with Jira 9.12.
  • Further improvements for Property calculations. (Does not yet include changes to "Issues without parents". This will come with version 3.65.0.)
  • Renamed "Planned" section header in Objectives Widget on Reports.
  • Fixed the Feature swimlane name on the Breakout Board when scrolling horizontally on a higher zoom level.
  • Fixed a bug where two features could overlap if the start or end date was modified in the detail view.
  • Fixed a bug on Roadmaps, Planning and Breakout Boards where dropdown menus did not close when switching to other views.
  • Fixed a bug where a CSS directive that was defined in another plugin hid the Unplanned Issues backlog.
  • Fixed a bug where the Quickfilters for the Unplanned Issues Backlog were taken from the wrong board. (Known Issue: If the Board with the lowest ID is a Scrum Board, this will still be the board from which the filters will be taken. This will be fixed once we release Primary Board for ART level with 3.64.3.)
3.64.2 800200251770 2023-11-30 Jira Server 8.6.0 - 9.12.15 server Pending
Release Notes:
  • All plugins are now compatible with Jira 9.12.
  • Further improvements for Property calculations. (Does not yet include changes to "Issues without parents". This will come with version 3.65.0.)
  • Renamed "Planned" section header in Objectives Widget on Reports.
  • Fixed the Feature swimlane name on the Breakout Board when scrolling horizontally on a higher zoom level.
  • Fixed a bug where two features could overlap if the start or end date was modified in the detail view.
  • Fixed a bug on Roadmaps, Planning and Breakout Boards where dropdown menus did not close when switching to other views.
  • Fixed a bug where a CSS directive that was defined in another plugin hid the Unplanned Issues backlog.
  • Fixed a bug where the Quickfilters for the Unplanned Issues Backlog were taken from the wrong board. (Known Issue: If the Board with the lowest ID is a Scrum Board, this will still be the board from which the filters will be taken. This will be fixed once we release Primary Board for ART level with 3.64.3.)
3.64.1 800200251710 2023-10-30 Jira Data Center 8.6.0 - 9.11.3 datacenter Pending
Release Notes:
  • Fixed NullPointerException during Manual Recalculation when projects had been removed from Hive.
  • Fixed an exception that could occur on a cluster with different number of cores per node.
  • Fixed a bug while displaying External Dependencies between Features and Team issues from different ART.
  • Refined calculation for ProgramBoardProperty and PlanningIntervalProperty.
  • Tested compatibility for Jira 9.10 and 9.11.
3.64.1 800200251700 2023-10-30 Jira Server 8.6.0 - 9.11.3 server Pending
Release Notes:
  • Fixed NullPointerException during Manual Recalculation when projects had been removed from Hive.
  • Fixed an exception that could occur on a cluster with different number of cores per node.
  • Fixed a bug while displaying External Dependencies between Features and Team issues from different ART.
  • Refined calculation for ProgramBoardProperty and PlanningIntervalProperty.
  • Tested compatibility for Jira 9.10 and 9.11.
3.64.0 800200251650 2023-09-08 Jira Data Center 8.6.0 - 9.9.2 datacenter Pending
Release Notes:
New Features
  • Improved property calculation for faster speed and optimized thread usage, allowing more specific calculations without the need to recalculate all issue properties
  • Agile Hive Settings: Customize number of parallel worker threads for property calculation
  • Breakout Board: Faster update of Features by improving property calculation speed
  • New Health Check for Teams' Primary Board Filters with multiple projects
  • Removed programIncrementId URL parameter on Roadmap views
  • New endpoint in the public API that returns the complete Project Hierarchy
Bugfixes
  • PIs can be deleted again
  • Burn-Up Chart: Parallel threads can no longer generate multiple Data Point entries
  • Dependency lines were displayed with wrong criticality colors
  • Removed 'Virtual dependencies' option on Portfolio & Solution Roadmap as this is not yet supported
  • Portfolio & Solution Roadmap: Added scrollbars in the project selection menu
Notes
  • A manual recalculation is required to fix the criticality color of Dependency lines
3.64.0 800200251640 2023-09-08 Jira Server 8.6.0 - 9.9.2 server Pending
Release Notes:

New Features

  • Improved property calculation for faster speed and optimized thread usage, allowing more specific calculations without the need to recalculate all issue properties
  • Agile Hive Settings: Customize number of parallel worker threads for property calculation
  • Breakout Board: Faster update of Features by improving property calculation speed
  • New Health Check for Teams' Primary Board Filters with multiple projects
  • Removed programIncrementId URL parameter on Roadmap views
  • New endpoint in the public API that returns the complete Project Hierarchy

Bugfixes

  • PIs can be deleted again
  • Burn-Up Chart: Parallel threads can no longer generate multiple Data Point entries
  • Dependency lines were displayed with wrong criticality colors
  • Removed 'Virtual dependencies' option on Portfolio & Solution Roadmap as this is not yet supported
  • Portfolio & Solution Roadmap: Added scrollbars in the project selection menu

Notes

  • A manual recalculation is required to fix the criticality color of Dependency lines
3.63.0 800200251620 2023-08-22 Jira Data Center 8.6.0 - 9.9.2 datacenter Pending
Release Notes:

Features

  • Roadmap now available for Portfolio & Solution Train projects.
  • Agile Hive navigation uniform across layers.
  • Improved change history access for faster property calculation.

Bug Fixes

  • Fixed Teams Involved error after team project deletion.
  • Fixed Portfolio & Solution Train level Teams Involved access in JQL Search.
  • Load value no longer sums Sub-Tasks with Story Points.
  • Fixed links conflicting with Agile Hive's Child of link.
  • Fixed Custom Epic Panel not loading for linked features in Jira 9.7.1.
  • Fixed Burn Up Chart load issue due to excessive data points, avoiding tab crashes.
  • Delimiters for Cost of Delay & WSJF set by user's language.

Known issues

  • Start dates > 2 years in the past can't be changed in Roadmap view. Workaround: Change Planned Start/End date fields.

Notes

  • Please enable Planned Start/End Date custom fields & include milestone issue type for Portfolio & Solution Train projects.
  • SAFe 6 Public API update in future release. Please check your custom scripts.
3.63.0 800200251610 2023-08-22 Jira Server 8.6.0 - 9.9.2 server Pending
Release Notes:

Features

  • Roadmap now available for Portfolio & Solution Train projects.
  • Agile Hive navigation uniform across layers.
  • Improved change history access for faster property calculation.

Bug Fixes

  • Fixed Teams Involved error after team project deletion.
  • Fixed Portfolio & Solution Train level Teams Involved access in JQL Search.
  • Load value no longer sums Sub-Tasks with Story Points.
  • Fixed links conflicting with Agile Hive's Child of link.
  • Fixed Custom Epic Panel not loading for linked features in Jira 9.7.1.
  • Fixed Burn Up Chart load issue due to excessive data points, avoiding tab crashes.
  • Delimiters for Cost of Delay & WSJF set by user's language.

Known issues

  • Start dates > 2 years in the past can't be changed in Roadmap view. Workaround: Change Planned Start/End date fields.

Notes

  • Please enable Planned Start/End Date custom fields & include milestone issue type for Portfolio & Solution Train projects.
  • SAFe 6 Public API update in future release. Please check your custom scripts.
3.62.2 800200251600 2023-08-14 Jira Data Center 8.6.0 - 9.9.2 datacenter Pending
Release Notes:

Improved the calculation of the property for independent issues. This can greatly improve the performance of background activity of Agile Hive.

3.62.2 800200251590 2023-08-14 Jira Server 8.6.0 - 9.9.2 server Pending
Release Notes:

Improved the calculation of the property for independent issues. This can greatly improve the performance of background activity of Agile Hive.

3.62.1 800200251520 2023-07-13 Jira Data Center 8.6.0 - 9.9.2 datacenter Pending
Release Notes:
  • It's now possible to zoom in or out of the ART Roadmap. Narrow down your planning time frame or obtaining a wider view on your planned issues.
  • Added Strategic Issue Type and Agile Hive Strategic Theme link to the standard Agile Hive Templates.
  • NOTE: If you want to use this issue type in your existing configurations, you have to add it manually to your Portfolio issue type scheme.
  • Changed calculation of the Teams Involved and issue ranking information for the Breakout Board data to fix a performance issue.
  • Also, we removed the Teams Involved call on this board that occurs every ten seconds.
  • Fixed a bug where the selection for the Feature Filter on the Breakout Board was not filled.
  • We made the "Update data" button on the Agile Hive views visible all the time, not just on hover over the info text.
  • Changed Debug log level to Trace in AgileHiveSprintService
  • Fixes a bug so that the sorting in the project menu is done alphabetically by project name (and no longer by Project Key)
3.62.1 800200251510 2023-07-13 Jira Server 8.6.0 - 9.9.2 server Pending
Release Notes:
  • It's now possible to zoom in or out of the ART Roadmap. Narrow down your planning time frame or obtaining a wider view on your planned issues.
  • Added Strategic Issue Type and Agile Hive Strategic Theme link to the standard Agile Hive Templates.
  • NOTE: If you want to use this issue type in your existing configurations, you have to add it manually to your Portfolio issue type scheme.
  • Changed calculation of the Teams Involved and issue ranking information for the Breakout Board data to fix a performance issue.
  • Also, we removed the Teams Involved call on this board that occurs every ten seconds.
  • Fixed a bug where the selection for the Feature Filter on the Breakout Board was not filled.
  • We made the "Update data" button on the Agile Hive views visible all the time, not just on hover over the info text.
  • Changed Debug log level to Trace in AgileHiveSprintService
  • Fixes a bug so that the sorting in the project menu is done alphabetically by project name (and no longer by Project Key)
3.61.0 800200251470 2023-06-28 Jira Data Center 8.6.0 - 9.9.2 datacenter Pending
Release Notes:

New Features

  • Added field to filter issues by a custom JQL query on the Program Board.

Bugfixes

  • Program & Team Report: On Windows with 125% screen resolution, the chevron for horizontal scrolling in the widgets can only be clicked once.
  • After v3.56 sprints without start date are not shown on reports

Improvements

  • Agile Hive and all bundled Apps are now compatible with Jira up to version 9.9
  • On the boards, the 'Display Options' menu has been split into 'Issue Layout' and 'Zoom' menu points respectively
3.61.0 800200251460 2023-06-28 Jira Server 8.6.0 - 9.9.2 server Pending
Release Notes:

New Features

  • Added field to filter issues by a custom JQL query on the Program Board.

Bugfixes

  • Program & Team Report: On Windows with 125% screen resolution, the chevron for horizontal scrolling in the widgets can only be clicked once.
  • After v3.56 sprints without start date are not shown on reports

Improvements

  • Agile Hive and all bundled Apps are now compatible with Jira up to version 9.9
  • On the boards, the 'Display Options' menu has been split into 'Issue Layout' and 'Zoom' menu points respectively
3.60.2 800200251410 2023-05-31 Jira Data Center 8.6.0 - 9.6.0 datacenter Pending
Release Notes:

Bugfixes

  • Burn Up Chart: Fixed a bug that caused the forecast to drop when the sum of SP done in the current PI was significantly higher than the velocity.
  • The data points in the Burn Up Chart were still stored in local user time, which led to unexpected behavior. Now they are handled like all other date objects in order to achieve more uniform behavior.
  • Project Hierarchy: In large hives, the projects on the right side were partially hidden and no longer accessible. This is fixed now.
  • Breakout Board: Fixed a bug, where the Independent issue lane was not visible when there were no independent issues.
  • Breakout Board: The subtasks displayed since version 3.60 are now hidden again.
  • The "AgileHiveHierarchyProperty" is no longer used. Existing data base entries will be removed by an upgrade task. The performance web service now relies on the "AgileHiveProgramIncrementProperty" - take this into account if you want to compare its results before this version with ones from now on.
3.60.2 800200251400 2023-05-31 Jira Server 8.6.0 - 9.6.0 server Pending
Release Notes:

Bugfixes

  • Burn Up Chart: Fixed a bug that caused the forecast to drop when the sum of SP done in the current PI was significantly higher than the velocity.
  • The data points in the Burn Up Chart were still stored in local user time, which led to unexpected behavior. Now they are handled like all other date objects in order to achieve more uniform behavior.
  • Project Hierarchy: In large hives, the projects on the right side were partially hidden and no longer accessible. This is fixed now.
  • Breakout Board: Fixed a bug, where the Independent issue lane was not visible when there were no independent issues.
  • Breakout Board: The subtasks displayed since version 3.60 are now hidden again.
  • The "AgileHiveHierarchyProperty" is no longer used. Existing data base entries will be removed by an upgrade task. The performance web service now relies on the "AgileHiveProgramIncrementProperty" - take this into account if you want to compare its results before this version with ones from now on.
3.60.0 800200251350 2023-05-11 Jira Data Center 8.6.0 - 9.6.0 datacenter Pending
Release Notes:

New Features

  • Added autocomplete field to filter issues by a custom JQL query on the Breakout Board.
  • We made the name adjustments for SAFe 6 compliance (i.e. Program to ART etc.).
  • The Custom Epic Panel now supports the "Swimlanes"-configuration for the respective board. Just choose the "Epic" option to display swimlanes based on the linked parent issues.

Bugfixes

  • Fixed a bug on the Breakout Board, where the "Expand/Collapse Issues" button was in the wrong state initially.

Improvements

  • Added the possibility to create PI-iterations and their sprints with custom start times.

Known Bugs

  • When JQL-Filter is active, and a issue is dragged to another position within the independent swimlane, an error shows up but the drag and drop is still working.
3.60.0 800200251340 2023-05-11 Jira Server 8.6.0 - 9.6.0 server Pending
Release Notes:

New Features

  • Added autocomplete field to filter issues by a custom JQL query on the Breakout Board.
  • We made the name adjustments for SAFe 6 compliance (i.e. Program to ART etc.).
  • The Custom Epic Panel now supports the "Swimlanes"-configuration for the respective board. Just choose the "Epic" option to display swimlanes based on the linked parent issues.

Bugfixes

  • Fixed a bug on the Breakout Board, where the "Expand/Collapse Issues" button was in the wrong state initially.

Improvements

  • Added the possibility to create PI-iterations and their sprints with custom start times.

Known Bugs

  • When JQL-Filter is active, and a issue is dragged to another position within the independent swimlane, an error shows up but the drag and drop is still working.
3.59.3 800200251320 2023-04-28 Jira Data Center 8.6.0 - 9.6.0 datacenter Pending
Release Notes:

Upgrade the bundled plugin InstaPrinta to version 2.11.1

3.59.3 800200251310 2023-04-28 Jira Server 8.6.0 - 9.6.0 server Pending
Release Notes:

Upgraded the bundled plugin InstaPrinta to version 2.11.1

3.59.2 800200251300 2023-04-21 Jira Data Center 8.6.0 - 9.6.0 datacenter Pending
Release Notes:

Fixed a bug that prevented the breakout board from loading when an issue was assigned to a sprint without an end-date.

3.59.2 800200251290 2023-04-21 Jira Server 8.6.0 - 9.6.0 server Pending
Release Notes:

Fixed a bug that prevented the breakout board from loading when an issue was assigned to a sprint without an end-date.

3.59.1 800200251280 2023-04-18 Jira Data Center 8.4.0 - 9.6.0 datacenter Pending
Release Notes:
  • Users can now specify exact times for the start and end of iterations and PIs, with the times automatically converted to other users' local times based on their time zones.
    • This can cause issues with the ART Roadmap display, as this view currently assumes that all dates are in the same timezone. We are working on a fix for this issue.
  • "Ghost" issues were displayed on the Breakout Board when sprints had no end date; this has been fixed.
    • End date of the iteration is now used as a fallback when the sprint has no end date.
  • Fixed an issue where boards were not loading when there were many ART issues present.
  • Log Level has been adjusted so that the following log message is now classified as a warning instead of an error:
    • "0 sprint references were found for the sprint with id. Expected exactly one."
3.59.1 800200251270 2023-04-18 Jira Server 8.4.0 - 9.6.0 server Pending
Release Notes:
  • Users can now specify exact times for the start and end of iterations and PIs, with the times automatically converted to other users' local times based on their time zones.
    • This can cause issues with the ART Roadmap display, as this view currently assumes that all dates are in the same timezone. We are working on a fix for this issue.
  • "Ghost" issues were displayed on the Breakout Board when sprints had no end date; this has been fixed.
    • End date of the iteration is now used as a fallback when the sprint has no end date.
  • Fixed an issue where boards were not loading when there were many ART issues present.
  • Log Level has been adjusted so that the following log message is now classified as a warning instead of an error:
    • "0 sprint references were found for the sprint with id. Expected exactly one."
3.59.0 800200251240 2023-04-12 Jira Data Center 8.4.0 - 9.6.0 datacenter Pending
Release Notes:

New Features

  • PI Roadmap: Now shows dependencies between issues of different ARTs.
  • Health Checks: Setting an admin user in the Agile Hive admin settings will now check if user has sufficient permissions for all projects in Agile Hive ("Browse project" and "Edit issues"). If not, this will result in a health check warning.

Improvement for PI Roadmap

  • The PI Roadmap will display a loading icon for each ART project individually so you won't have to wait until all issues are loaded.

Bugfixes

  • Breakout Board: Fixed a bug that prevented the Breakout Board from loading, when sprints did not have an end date set.
  • PI Roadmap: Fixed a bug in Safari browser, where the PI Roadmap would not be displayed.

Known Issues

  • Breakout Board: Issues in sprints with no end date set, will be displayed transparent. A fix for this will be supplied within the next Agile Hive release.
3.59.0 800200251230 2023-04-12 Jira Server 8.4.0 - 9.6.0 server Pending
Release Notes:

New Features

  • PI Roadmap: Now shows dependencies between issues of different ARTs.
  • Health Checks: Setting an admin user in the Agile Hive admin settings will now check if user has sufficient permissions for all projects in Agile Hive ("Browse project" and "Edit issues"). If not, this will result in a health check warning.

Improvement for PI Roadmap

  • The PI Roadmap will display a loading icon for each ART project individually so you won't have to wait until all issues are loaded.

Bugfixes

  • Breakout Board: Fixed a bug that prevented the Breakout Board from loading, when sprints did not have an end date set.
  • PI Roadmap: Fixed a bug in Safari browser, where the PI Roadmap would not be displayed.

Known Issues

  • Breakout Board: Issues in sprints with no end date set, will be displayed transparent. A fix for this will be supplied within the next Agile Hive release
3.58.0 800200251160 2023-02-16 Jira Data Center 8.4.0 - 9.6.0 datacenter Pending
Release Notes:

New Features

  • Program Roadmap: Show additional ARTs on the roadmap to synchronize planing, show issue progress etc. Future release will also show dependencies between ART-issues.
  • The Health Check now validates if the Admin-user for the property calculation has Browse Project - and Edit Issues Permissions on all Projects in the Hive.
  • Fixed a bug that prevented apps that are bundled within the Agile Hive Suite from being disabled without affecting the other apps from working properly.

Known issues

  • Showing multiple ARTs with a lot of issues might impact the performance of the roadmap UI depending on your system
3.58.0 800200251150 2023-02-16 Jira Server 8.4.0 - 9.6.0 server Pending
Release Notes:

New Features

  • Program Roadmap: Show additional ARTs on the roadmap to synchronize planing, show issue progress etc. Future release will also show dependencies between ART-issues.
  • The Health Check now validates if the Admin-user for the property calculation has Browse Project - and Edit Issues Permissions on all Projects in the Hive.
  • Fixed a bug that prevented apps that are bundled within the Agile Hive Suite from being disabled without affecting the other apps from working properly.

Known issues

  • Showing multiple ARTs with a lot of issues might impact the performance of the roadmap UI depending on your system
3.57.0 800200251140 2023-01-25 Jira Data Center 8.4.0 - 9.5.1 datacenter Pending
Release Notes:
Improvements for the Roadmap
  • You can now move issues into already occupied rows, moving the existing issues to the row below. Also resizing issues can move issues that would lead to overlapping into a new row.
  • New Drag and Drop Library for the roadmap (smoother dragging from sidebar, replacing existing issues, better date snapping)

Improvements for the ART and LS Report

  • The PI Overview widget will now show existing WSJF values for the displayed issues. The WSJF value is also used for the issues' order now.

New Quality of Life Feature for the Project Hierarchies

  • It is not longer necessary to unlink every project from its parent in order to move said parent to a new parent (e.g. move an entire ART to new Portfolio)

Last but not least, we changed the Agile Hive logos to a new design.

3.57.0 800200251130 2023-01-25 Jira Server 8.4.0 - 9.5.1 server Pending
Release Notes:

Improvements for the Roadmap

  • You can now move issues into already occupied rows, moving the existing issues to the row below. Also resizing issues can move issues that would lead to overlapping into a new row.
  • New Drag and Drop Library for the roadmap (smoother dragging from sidebar, replacing existing issues, better date snapping)

Improvements for the ART and LS Report

  • The PI Overview widget will now show existing WSJF values for the displayed issues. The WSJF value is also used for the issues' order now.

New Quality of Life Feature for the Project Hierarchies

  • It is not longer necessary to unlink every project from its parent in order to move said parent to a new parent (e.g. move an entire ART to new Portfolio)